A number beside every stage, not a surprise at tender.
Cost plans priced from a builder’s own library of finished projects, delivered in 48 hours, with the allowances named and a reconciliation from stage to stage. Independent of whoever ends up building it.
Concept cost range
48 hoursA cost band from concept sketches, with the three or four drivers that move it. For the first budget conversation with a client.
- A cost range, not a single number, with the drivers named
- Trade-level allowances and what sits outside them
- The questions to resolve before the next stage
Design cost plan
48 hoursA trade-by-trade cost plan on developed design, with allowances named and a certainty profile. The check you run while you can still change the drawings.
- Trade-level cost plan with named allowances
- Elemental view for QS-literate readers
- Decision register and exclusions schedule
- Reconciles to the concept range if we did one
Pre-tender cost plan
48 hoursThe number to take to tender. Priced on near-construction documents with engineering, so the tenders land against a plan, not a hope.
- Full trade breakdown with provisional sums and prime costs identified
- Elemental view and cost per square metre
- Tender-readiness notes: what is unpriceable as drawn
- Reconciliation to earlier stages
Tender review
48 hoursTenders in hand, plan beside them. We show where each tender is thin, heavy or silent, and the questions to ask before you recommend one.
- Side-by-side of every tender against the cost plan
- Scope gaps and silent exclusions per tender
- Provisional sum and prime cost exposure
- A recommendation memo you can forward
How it works
What you get
A report on your own page: the number, the drivers, the allowances, the exclusions and the questions still open. Shareable by link. An elemental view for QS-literate readers sits behind the trade view.
How it stays clean
Fixed fee, paid up front, 48 hours. Your documents are used for your report and nothing else. Fees are fees, not a foot in the door.